Run history tab

The 'Run history' tab is the first and default tab on the Transformation page. Here, you will find a sidebar with a list of runs and detailed information about the selected run.

___13.png

 

List of runs

The left menu contains the following information:

  • Run status icon:
    • Planned;
    • Running;
    • Done;
    • Failed/Error;
    • Rejected/Canceled;
  • Date and time;
  • Run type:
    • Manually;
    • Scheduled by time trigger.
    • Dependency by trigger.

To update information about running the Transformation, click on the icon.

___17.png

After manually run of the Transformation, the user navigates to the 'Run history' tab, where the current Run status is displayed in the sidebar and automatically updates every 5-10 seconds.

___12.png

 

Run details

Detailed information about running the Transformation is presented in three parts:

  • Overall about Transformation: run ID, status, and run time. This information will be helpful when contacting bi@owox.com if you have any questions.
    ___14.png
  • Short overview of each Operation in the Transformation: run ID, status, run time, and Destination settings. 
    ___15.png
  • List of Variables with values. This log section is displayed only if variables have been created and used in the Transformation.
    ___18.png
  • Detailed info about each Operation: title, status, Operation ID, time start and end, duration, Operation run count, and Destination settings.
    ___16.png
  • Compiled SQL code for each Operation: this code executes through the Google BigQuery API, and it’s helpful for you while you are debugging.
    ___20.png

When contacting with OWOX BI Support Team, you can copy the full text of the logs by clicking on this icon:

___19.png

Was this article helpful?
0 out of 0 found this helpful
Have more questions? Submit a request

0 Comments

Please sign in to leave a comment.